F.P.V. "Aegis" - Major Refit - Pwllheli - 2008
Click on photos to enlarge
The Lift
|
Outside lifting dock |
Tight fit |
Coming up |
In hoist |
Removing Both Engines
|
Lifting deck panel |
Lifting first engine |
Port engine |
Port engine out |
Lifting second engine |
Lowering starboard engine |
|
Both engines out |
Both engines on lorry |
The Hull
|
Hull shot blasted - bow |
Hull shot blasted - stern |
Hull primed - bow |
Hull primed - bow |
|
Hull antifouled - bow |
Hull antifouled - stern |
Repairing gel coat |
|
Testing electrical equipment |
Plastic sheeting in engine room |
Preparing to fibreglass |
Worn Engine Components
|
Crevices/cracking caused by corrosion due to scale of nobility |
Click on link for video of:
Removal of both engines
http://www.youtube.com/watch?v=fxylxTgQhn8
Return of the cats - Part I
http://www.youtube.com/watch?v=6XwBWFyT1tI